Reconstruction of the shaft hoisting equipment at Konrad No. 2 Shaft

The old hoisting equipment at Konrad No. 2 Shaft was dismantled and the headframe as well as the buildings near the shaft were demolished.


A temporary headframe, hoisting system, a stage winder with a 3-deck working platform and an emergency hoist were assembled. The guiding system, man-riding shaft and various pipelines were cleared with the newly assembled hoisting plant.  The working platform was subsequently converted for the purpose of keeping the shaft open, a two-storey hoisting cage for the rope winding system was assembled and an descent facility installed in the 1st sole for rescue in an emergency.

 

 